✉ sales-service@shakraenergy.com☎ 1300 512 662
Client PortalCareersNews & Insights
COMMERCIAL SOLAR

Solar carports for Australian commercial sites

Turn a commercial car park into space for solar generation, shaded parking and future EV charging. Shakra Energy can help assess the site and plan an integrated energy project.

Solar canopy at the Brisbane car park project
01

What is a solar carport?

A solar carport places solar panels on a purpose-built canopy above parking spaces. It makes use of an area already serving the business, while allowing the roof of the main building to remain available for other equipment or uses. The canopy design, parking layout and electrical system need to be assessed together.

02

Where solar carports can fit

Shopping centres, workplaces and other commercial sites with open parking areas are candidates for assessment. The first question is not how many panels will fit: it is how the proposed structure will work with the site’s access, parking and electricity demand. Shading from nearby buildings, vehicle clearance, pedestrian routes and existing underground services can all influence the layout.

03

Start with the electricity demand

A useful feasibility review starts with electricity bills and interval consumption data. Compare the business’s daytime demand with expected solar generation, then consider export limits and planned changes such as EV charging. A large canopy does not automatically make the largest possible solar system the right commercial choice.

04

What affects project cost?

The steel structure, foundations, drainage, ground conditions, electrical connection and distance to the switchboard can materially affect cost. Parking access during construction is another planning consideration. Request a site-specific scope that separates the canopy works, solar equipment, electrical works and any optional charging or storage systems. A generic price per panel will not capture the whole project.

05

Can a solar carport include EV charging?

Yes, charging can be considered as part of the electrical design. Start with who will use the chargers and how long their vehicles are parked. Staff parking, customer charging and fleet operations can have different requirements. Charger selection also needs to account for vehicle compatibility and the electrical capacity available at the site.

06

Does the project need a battery?

Not necessarily. Solar-only and solar-plus-storage options should be assessed separately. A battery may help shift solar energy to another time, but its value depends on the site’s demand, tariffs and operating requirements. Backup power is a separate design requirement and should not be assumed from the presence of a battery.

07

Brisbane solar carpark experience

The Shakra Energy project portfolio includes the 100kW Car Park Project Brisbane and Buranda Solar Carport. These existing project examples provide a starting point for a conversation about commercial parking areas; a new site still requires its own engineering and feasibility assessment.

08

What to send for an initial assessment

Provide the site address, a car park plan or aerial image, recent electricity bills, available interval data, information about site ownership or tenancy, and any EV charging plans. Include parking restrictions and your intended project timing so the assessment can consider operational requirements.

09

Discuss your site

Contact Shakra Energy on 1300 512 662 or sales-service@shakraenergy.com to discuss a commercial solar carport assessment.

PLAN YOUR PROJECT

Practical energy planning guides

PLANNING GUIDE

Commercial solar carports

Assess your parking area, electricity demand and options for EV charging.

Read guide →
PLANNING GUIDE

Solar and battery storage

Compare solar-only and storage options using your business’s operating requirements.

Read guide →
PLANNING GUIDE

Choosing a home EV charger

Check vehicle compatibility, electrical supply and installation requirements.

Read guide →

Explore our 100kW Brisbane car park project, Buranda solar carport and EV charging range.

WHY SHAKRA ENERGY

Local expertise. Global capability.

Reliable, bankable infrastructure built for the future.

5+ GWPipeline
10+Countries
2,500+Experts
500+ MWhDeployed
15+Years

Combined global manufacturing, engineering, and deployment capability delivered through Shakra Energy’s strategic partnership with Shenglong Electric Group.

START A CONVERSATION

Ready to power your next project?

Tell us where you are in the journey. Our infrastructure team will help shape the next practical step.